Boyd, P, Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: incorporating building integrated photovoltaics. Construction Management and Economics, 33(05), 349-60.

Galea, N, Powell, A, Loosemore, M and Chappell, L (2015) Designing robust and revisable policies for gender equality: lessons from the Australian construction industry. Construction Management and Economics, 33(05), 375-89.

Gosling, J, Naim, M, Towill, D, Abouarghoub, W and Moone, B (2015) Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics, 33(05), 390-403.

Hook, M, Stehn, L and Brege, S (2015) The development of a portfolio of business models: a longitudinal case study of a building material company. Construction Management and Economics, 33(05), 334-48.

Löwstedt, M (2015) ‘Taking off my glasses in order to see’: exploring practice on a building site using self-reflexive ethnography. Construction Management and Economics, 33(05), 404-14.

O’Keeffe, D, Thomson, D and Dainty, A (2015) Evaluating the design of hospitals within a practice order network. Construction Management and Economics, 33(05), 415-27.

Seboni, L and Tutesigensi, A (2015) Project manager-to-project allocations in practice: an empirical study of the decision-making practices of a multi-project based organization. Construction Management and Economics, 33(05), 428-43.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2015.1077981
  • Abstract:
    Empirical studies that examine how managers make project manager-to-project (PM2P) allocation decisions in multi-project settings are currently limited. Such decisions are crucial to organizational success. An empirical study of the PM2P practice, conducted in the context of Botswana, revealed ineffective processes in terms of optimality in decision-making. A conceptual model to guide effective PM2P practices was developed. The focus of this study is on deploying the model as a lens to study the PM2P practices of a large organization, with a view to identifying and illustrating strengths and weaknesses. A case study was undertaken in the mining industry, where core activities in terms of projects are underground mineral explorations at identified geographical regions. A semi-structured interview protocol was used to collect data from 15 informants, using an enumeration. Integrated analysis of both data types (using univariate descriptive analysis for the quantitative data, content and thematic analysis for the qualitative data) revealed strengths in PM2P practices, demonstrated by informants' recognition of some important criteria to be considered. The key weaknesses were exemplified by a lack of effective management tools and techniques to match project managers to projects. The findings provide a novel perspective through which improvements in working practices can be made.

Sherratt, F (2015) Legitimizing public health control on sites? A critical discourse analysis of the Responsibility Deal Construction Pledge. Construction Management and Economics, 33(05), 444-52.

Sherratt, F, Crapper, M, Foster-Smith, L and Walsh, S (2015) Safety and volunteer construction workers. Construction Management and Economics, 33(05), 361-74.

Shibeika, A and Harty, C (2015) Diffusion of digital innovation in construction: a case study of a UK engineering firm. Construction Management and Economics, 33(05), 453-66.

Ulubeyli, S, Arslan, V and Kivrak, S (2015) A semiotic analysis of cartoons about occupational health and safety issues in the construction workplace. Construction Management and Economics, 33(05), 467-83.

Viking, A and Lidelöw, S (2015) Exploring industrialized housebuilders’ interpretations of local requirements using institutional logics. Construction Management and Economics, 33(05), 484-94.

Xiong, B, Skitmore, M and Xia, B (2015) Exploring and validating the internal dimensions of occupational stress: evidence from construction cost estimators in China. Construction Management and Economics, 33(05), 495-507.